NUCLEAR STEEL FABRICATORS

Industry-Leading Nuclear Fabrication Capabilities

WEC Fabrication brings decades of specialised experience to the manufacture of complex components for the nuclear sector. From containment and pressure vessels to lifting frames, fluorine cells, and structural steelwork, our capabilities cover the full spectrum of nuclear metal fabrication.

Our collaborative approach ensures each project is delivered to the highest specification, backed by detailed design, LTQR (Lifetime Quality Records), and Non-Destructive Testing (NDT) methods. We also operate a dedicated clean welding room for nuclear stainless steel, ensuring no carbon steel is ever present and maintaining the highest standards of contamination control. We are a trusted partner to major clients across the UK nuclear supply chain, supporting critical infrastructure and waste management operations.

NUCLEAR FABRICATION

Our Customers

At WEC Fabrication we provide quality manufactured products for some of the biggest industry names.

WEC NUCLEAR FABRICATION

High-Integrity Nuclear Components & Fabrications

We manufacture complex, safety-critical fabrications that meet the demanding standards of the UK nuclear industry. 

Containment Vessels

Engineered for the safe storage and transport of nuclear materials.

Waste Handling Tables & Gloveboxes

Manufactured with strict contamination control standards

Hoppers & Chutes

Designed for efficient material handling in nuclear processing facilities

Fluorine Cells

Fabricated using high-density materials for radiation protection

Safety-Critical Structural Steelwork

Essential for new nuclear power plants and decommissioning sites

Pressure Vessels & Pipework

Precision-welded to meet stringent nuclear safety requirements

Our commitment to quality and precision ensures every component is built to perform under extreme operating conditions.

WEC FABRICATION

Commitment to Quality & Compliance

We are committed to delivering quality-assured nuclear fabrications that meet the most stringent industry standards. We are accredited to ISO 9001:2015, BS EN 1090, ISO 14001, ISO 45001, and comply with ASME welding standards. We hold procedures to BS 15614-1 & qualifications to ISO 9606-1 and also ASME equivalents. We are also accredited to BS EN 1090-2, ISO 3834 & AWS D1.1. Every project is supported by full traceability, certified procedures, and robust inspection protocols to ensure compliance, safety, and long-term reliability.

Our wide range of Red Stamped Approved procedures for Sellafield and other nuclear sites ensures full compliance with the strict regulations governing the nuclear sector.

RECENT INVESTMENT

New 60,000 sq ft Heavy Machining and Nuclear Fabrication facility

We're is investing £10 million in a new 60,000 sq. ft. Heavy Machining and Nuclear Fabrication facility at Walker Park, Blackburn, adjacent to our existing WEC Machining site. Set to become the largest of its kind in Europe, the facility will house six new CNC machining centres capable of handling components up to 30 metres long and 5 metres in diameter.

This expansion enhances our capability to deliver complex, safety-critical nuclear fabrications. Backed by over 45 years of experience, our team of 200+ skilled fabricators operates with a right-first-time ethos, supported by advanced 3D modelling, LTQRs, and robotic welding technology.

WORLD CLASS ENGINEERS

We provide nuclear fabrications for nuclear grade materials including:

WEC FABRICATION

Recent Projects

West Fence

Designed to aid the safe working at heights on a nuclear material handler, we worked with the customer to design and fabricate this protective fence.

Fabricated from quality Grade 3 steel the full build to print project took 6 months, including undergoing an extensive FAT procedure before being dispatched to site.

Duplex Waste Handling Table

Fabricated to enable robot sorting of hazardous nuclear waste, this Duplex Waste Handling Table was fully manufactured at our WEC Group site in Darwen, using a mix of 304, 316 quality grade 2 & Duplex steel.

Working closely with the customer, the build to print fabrication process took 2.5 years to deliver a qualilty finish, with the finished product delivered to the customer ahead of schedule.

LLTP Platform Project

Designed to traverse a hazardous container from rolling stock to the processing facility and made from 100% quality Grade 2 steel, we recently completed this barrier gate for one of our valued customers.

The build to print process took 2 years with full traceability of material used. Including welding, NDT and paint reports.

Case Studies

Demineralised Water Pump Skid

The Demineralised Water Pump Skid was designed and manufactured for a valued customer in the nuclear sector to safely supply demineralised water for the decontamination of robotic equipment, with built-in protection to prevent contaminated water from flowing back into the mains supply. Developed in line with an agreed inspection and test plan, the system underwent rigorous quality controls including certified materials, approved procedures, dimensional checks, non-destructive testing, chemical cleaning, and full factory acceptance testing to ensure fitness for purpose.

Fabricated primarily from 304L and 316L stainless steel, the skid was produced using a combination of in-house capabilities and trusted specialist suppliers for machining, electrical works, testing, and cleaning. From accepted inspection plan to completion, the project took just over a year and forms part of an ongoing programme of BEP packages supporting complex nuclear handling and recovery systems.

Read More

Demineralised Water Pump Skid

The Demineralised Water Pump Skid was designed and manufactured for a valued customer in the nuclear sector to safely supply demineralised water for the decontamination of robotic equipment, with built-in protection to prevent contaminated water from flowing back into the mains supply. Developed in line with an agreed inspection and test plan, the system underwent rigorous quality controls including certified materials, approved procedures, dimensional checks, non-destructive testing, chemical cleaning, and full factory acceptance testing to ensure fitness for purpose.

Fabricated primarily from 304L and 316L stainless steel, the skid was produced using a combination of in-house capabilities and trusted specialist suppliers for machining, electrical works, testing, and cleaning. From accepted inspection plan to completion, the project took just over a year and forms part of an ongoing programme of BEP packages supporting complex nuclear handling and recovery systems.

Read More
WEC FABRICATION

Why Choose WEC Fabrication for Nuclear Projects?

WEC Fabrication is a trusted leader in UK nuclear fabrication, with a long-standing reputation for delivering high-quality, safety-critical components for the nuclear industry. With decades of experience supporting nuclear decommissioning and new-build projects, we combine specialist expertise with full compliance to industry standards, including ASME and ISO certifications.

Choosing WEC means partnering with a fully certified nuclear-approved fabricator committed to quality, safety, and delivering right-first-time results for every nuclear project.

FAST DELIVERY

Fast Lead Times and Nationwide Delivery

At WEC Fabrication, we understand the importance of meeting critical project deadlines within the nuclear sector. Our strategically located facilities across the UK, positioned near key motorway networks, allow for the efficient and secure transportation of large, safety-critical nuclear fabrications.

With our own fleet of professional drivers and a network of trusted logistics partners, we offer flexible delivery solutions to suit complex nuclear project requirements, ensuring components arrive safely, on time, and in full. From precision machining to final delivery, we’re committed to minimising delays and supporting the smooth execution of nuclear contracts nationwide.

WEC FABRICATION

Expert On-Site Installation and Support

WEC Fabrication provides expert on-site installation and support for nuclear projects, delivering complex components safely and efficiently. Our highly skilled teams have extensive experience handling sensitive equipment and structures, including containment vessels, lifting frames, and specialised assemblies, ensuring every installation meets strict nuclear industry standards. We manage the full process from transport to precise placement, working closely with our clients to minimise disruption and maintain project schedules, providing a reliable, end-to-end solution for critical nuclear infrastructure fabrication.

WEC FABRICATION SECTORS

Other Sectors/Markets

WEC Fabrication has extensive experience in delivering large-scale, heavy engineering solutions for the nuclear sector. We regularly manufacture high-integrity structures, pressure vessels, and complex fabrications designed to meet the demanding requirements of nuclear power and decommissioning projects. Our proven capabilities also extend to other highly regulated industries such as Automotive, Tanks & Vessels, Agricultural and more.